As the busiest container port in East Marmara, Evyapport offers port services 24 hour a day ensuring all handling operations are carried out safely and efficiently for our customers. More than %50 of the region’s import and export trade passes through the Evyapport and its road and rail connections link it to the country’s major markets, providing customers second to none logistics solutions and quality service.

The port plays pivotal role in keeping Turkish economy moving with around 1200 ships passing through its terminals each year including the ultra large container vessels afloat today.

27 shipping lines operate from Evyapport, offering 48 services covering 180 ports around the world. The port operates 24 hours a day, seven days a week. Over 750 employees work to ensure that the ports day-to-day operations run smoothly.

The total developed area of Evyapport stands at 265.000 square meter with a capacity to handle 855.000 TEUs per annum. The terminal has 4 deep-water berths, varying in depth from 15.9 meters to 22 meters alongside.

The terminals is serviced by 5 Mobile harbour cranes and 4 ultra post-Panamax ship-to-shore gantry cranes with an outreach of 23 containers wide and are equipped with twin lift capability and heavy lift capacity of 70 tonnes.

With sufficient deep water and ultra post-Panamax container cranes, Evyapport is able to accommodate the very latest generation of container vessels up to 400 meters 18.000 TEUs.

The container storage area is served by a fleet of 26 rubber-tyred gantry cranes with a stacking capacity of 20.000 TEUs.

  • Berthing Facilities
  • NO of BERTH
  • LENGHT
  • DEPTH
  • 2
  • 358 M
  • 16 M
  • 3
  • 358 M
  • 16 M
  • 5
  • 455 M
  • 16 M
  • 6
  • 455 M
  • 16 M

Evyapport provide affordable and safe transportation operations to its customers via direct connection to Istanbul-Ankara main railway line.

Thanks to railway infrastructure, Evyapport contributes to lessen CO2 emissions. The port offers rapid, environment-friendly and cost-efficient transportation opportunities.

Evyapport serves by 5 MHCs, 2*18 row SSGs, 2*23 row SSGs, 52 terminal tractors, 4 Reach stackers, 2 empty stackers, 26 RTGs and several forklifts that have capacity between 3-33 tons.

  • EQUIPMENT
  • QTY
  • BRAND
  • CAPACITY
  • SHIP TO SHORE GANTRY CRANE-SSG
  • 2
  • LIEBHEER
  • 23 Row- 65 TONs
  • SHIP TO SHORE GANTRY CRANE-SSG
  • 2
  • KALMAR
  • 18 Row- 65 TONs
  • MOBILEHARBOR CRANE-MHC
  • 1
  • GOTTWALD
  • 14 Row-100 TONs
  • MOBILEHARBOR CRANE-MHC
  • 1
  • GOTTWALD
  • 17 Row-100 TONs
  • MOBILEHARBOR CRANE-MHC
  • 1
  • LIEBHEER
  • 18 Row-100 TONs
  • MOBILEHARBOR CRANE-MHC
  • 2
  • GOTTWALD
  • 17 Row-140 TONs
  • RUBBER TYRED GANTRY CRANE –RTG
  • 4
  • KALMAR-KONECRANES
  • 5+1 Row- 40 TONs
  • RUBBER TYRED GANTRY CRANE –RTG
  • 22
  • KALMAR-KONECRANES
  • 6+1 Row- 40 TONs
  • CONTAINER REACH STACKER
  • 4
  • KALMAR
  • 45 TONs
  • EMPTY CONTAINER STACKER
  • 2
  • KALMAR
  • 8 TONs
  • TERMINAL TRACTOR
  • 52
  • MAFI-KALMAR
  • 80 TONs
  • FORKLIFT
  • 15
  • KALMAR-LINDE-SMW
  • 3-33 TONs
  • TRAILER
  • 58
  • MERAL KASA-MAFI
  • 50-65-100 TONs
  • OVERHEIGHT FRAME
  • 4
  • BROMMA
  • 50 TONs
  • GOOSENECK
  • 1
  • MAFI
  • 100 TONs

Equipment and Yard Investments;

By January 2014, Evyapport completed the finger jetty expansion project and its berthing capacity reached to 1171 meters. Consequently, it can operates 2 mother ship that longer than 300 meters and smaller feeder vessels at the same time.

Evyapport continues its equipment investments in parallel with yard investments. 1 MHC which have handling capacity of 100 tons commenced to operate in January 2014 and 10 terminal tractors commenced to operate in April 2014. Also, 2*23 Row SSGs commenced to operate as of July 2014 and 4 RTGs as of December 2014 as planned. Other equipment investments consists of 4 RTGs as of June 2015 and 17 YTTs as of June 2015.

Gate Automation System

By the completion of gate automation system that being tested, the truck turn time performance will be reduced significantly and will reach to the optimum cycle approximately 15 minutes.

Evyapport can carry out stuffing and stripping operations of wide variety of cargo by forklifts that have capacity between 3-33 tons and its special attachments. Operations of OOG cargoes, Open Top and Flat Rack containers are carried out smoothly.

In addition Evyapport provides project cargo handling capability, utilizing its experienced workforce with many special designed lifting equipments to handle the more complicated heavy project cargoes.

  • FORKLIFTS
  • BRAND
  • QTY
  • CAPACITY
  • LINDE
  • 8
  • 3 TONs
  • LINDE
  • 2
  • 5 TONs
  • KALMAR
  • 2
  • 8 TONs
  • MECLIFT
  • 1
  • 16 TONs
  • KONECRANES
  • 1
  • 32 TONs
  • KALMAR
  • 1
  • 33 TONs